{"id":37,"date":"2017-07-31T17:46:34","date_gmt":"2017-07-31T17:46:34","guid":{"rendered":"http:\/\/box2043.temp.domains\/~naganine\/mmsme-org\/?page_id=37"},"modified":"2019-04-20T05:07:20","modified_gmt":"2019-04-20T05:07:20","slug":"dealing-with-construction-permits","status":"publish","type":"page","link":"https:\/\/mmsme.org\/?page_id=37","title":{"rendered":"Dealing with construction permits"},"content":{"rendered":"<p><strong>Myanmar Rank 2019: 81\/190 (2018: 73, Regress -8)<\/strong><\/p>\n<p><a href=\"https:\/\/mmsme.org\/wp-content\/uploads\/2019\/04\/DB2019-Construction-Permits-Myanmar.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-313\" src=\"https:\/\/mmsme.org\/wp-content\/uploads\/2019\/04\/DB2019-Construction-Permits-Myanmar.png\" alt=\"\" width=\"1472\" height=\"546\" srcset=\"https:\/\/mmsme.org\/wp-content\/uploads\/2019\/04\/DB2019-Construction-Permits-Myanmar.png 1472w, https:\/\/mmsme.org\/wp-content\/uploads\/2019\/04\/DB2019-Construction-Permits-Myanmar-300x111.png 300w, https:\/\/mmsme.org\/wp-content\/uploads\/2019\/04\/DB2019-Construction-Permits-Myanmar-768x285.png 768w, https:\/\/mmsme.org\/wp-content\/uploads\/2019\/04\/DB2019-Construction-Permits-Myanmar-1024x380.png 1024w\" sizes=\"auto, (max-width: 1472px) 100vw, 1472px\" \/><\/a><\/p>\n<p><i>Doing Business<\/i>\u00a0records all procedures required for a business in the construction industry to build a warehouse along with the time and cost to complete each procedure. In addition,\u00a0<i>Doing Business<\/i>\u00a0measures the building quality control index, evaluating the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes, and professional certification requirements. Information is collected through a questionnaire administered to experts in construction licensing, including architects, civil engineers, construction lawyers, construction firms, utility service providers and public officials who deal with building regulations, including approvals, permit issuance and inspections. [<a href=\"http:\/\/www.doingbusiness.org\/en\/methodology\/dealing-with-construction-permits\"><em>More&#8230;<\/em><\/a>]<\/p>\n<p><strong>What are the time, cost and number of procedures to comply with\u00a0formalities\u00a0to build a warehouse?<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-263\" src=\"https:\/\/mmsme.org\/wp-content\/uploads\/2018\/10\/Dealing-with-construction-permits-Figure1.png\" alt=\"\" width=\"598\" height=\"289\" srcset=\"https:\/\/mmsme.org\/wp-content\/uploads\/2018\/10\/Dealing-with-construction-permits-Figure1.png 482w, https:\/\/mmsme.org\/wp-content\/uploads\/2018\/10\/Dealing-with-construction-permits-Figure1-300x145.png 300w\" sizes=\"auto, (max-width: 598px) 100vw, 598px\" \/><\/p>\n<p>Source: World Bank<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Myanmar Rank 2019: 81\/190 (2018: 73, Regress -8) Doing Business\u00a0records all procedures required for a business in the construction industry to build a warehouse along with the time and cost to complete each procedure. In addition,\u00a0Doing Business\u00a0measures the building quality control index, evaluating the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes, and professional certification requirements. Information is collected through a questionnaire administered to experts in construction licensing, including architects, civil engineers, construction lawyers, construction firms, utility service providers and public officials who deal with building regulations, including approvals, permit issuance and inspections. [More&#8230;] What are the time, cost and number of procedures to comply with\u00a0formalities\u00a0to build a warehouse? Source: World Bank<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-37","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/mmsme.org\/index.php?rest_route=\/wp\/v2\/pages\/37","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mmsme.org\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/mmsme.org\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/mmsme.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mmsme.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=37"}],"version-history":[{"count":8,"href":"https:\/\/mmsme.org\/index.php?rest_route=\/wp\/v2\/pages\/37\/revisions"}],"predecessor-version":[{"id":319,"href":"https:\/\/mmsme.org\/index.php?rest_route=\/wp\/v2\/pages\/37\/revisions\/319"}],"wp:attachment":[{"href":"https:\/\/mmsme.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=37"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}